Screen: /
CPG is a small MRP II planning tool: it turns what customers want into plans for what to buy and what to make.
Sign in on the sign-in page with the account the administrator gave you. The built-in administrator signs in as admin.
The sidebar on the left of every page lists the screens your account can open: the TEST | PROD switch at the top, the tenant's own screens (Overview, Master data, Audit) under it, and the screens shared by both tenants, Help included, at the bottom. The button at the top of the sidebar, or Ctrl+B (⌘B on a Mac), shrinks it to icons and back. On a phone, open it with the Menu button. Every new screen of CPG adds its own topic here.
Screen: /login
Choose Sign in on the homepage or at the top of the page, enter your username and password, then choose Sign in.
If either is wrong you see “Invalid username or password. Check both and try again. If you cannot sign in, contact your administrator.” CPG never says which of the two was wrong.
After several failed attempts, signing in pauses for 15 minutes. Wait, then try again.
A session lasts 12 hours. Sign out from your account card, with your name, at the bottom of the sidebar when you are done.
Screen: /admin
The Tenants page is where every account lands after signing in: choose the Test or Prod tenant there. Your language and theme, your API tokens and Sign out are in your account card at the bottom of the sidebar. There is no password change: only the administrator sets passwords.
The administrator opens this page from Administration → Tenants in the sidebar, next to Users, and also sees the Database card here. The card shows where CPG keeps its data, how many migrations are applied, whether any are still pending, and how many settings are stored.
A pending migration normally means CPG is still starting. If it stays, tell whoever runs CPG.
The administrator's Read-only card makes Test or Prod read-only, and writable again, after a confirmation. Each tenant has its own flag, and every change is kept in the Global audit. A read-only tenant shows Read-only on the chooser, a lock on its side of the TEST | PROD switch, and a banner on its pages.
Reset Test, on this page for the administrator, permanently replaces Test business data and its audit with a fresh demonstration dataset, generated for today, and a new generation. Pick the dataset first: Tiny, two months of history, is written in a moment and is what a new installation starts with; Realistic, two years of history, can take a minute or two, and CPG answers nobody else until it is done. It restores the previous read-only flag. Prod, users, sessions, tokens, preferences and Global audit survive. Old Test forms must reload. The API is POST /api/tenants/test/reset with an empty object for tiny or { "dataset": "realistic" }, an admin bearer token, Idempotency-Key and the current Dataset-Generation. After a lost response, fetch the new generation and retry the same key, never a new one. How the datasets plan their week, beside Reset Test, shows which documents a reset leaves open on each weekday.
Open Test or Open Prod takes you to that tenant's business data.
Screen: /admin/users
Only the administrator opens Users, under Administration in the sidebar. Create user adds a normal user with a username (3–32 lowercase letters, digits, dots, dashes or underscores) and an initial password of at least 12 characters. Tell them the password yourself.
Reset password, in a user's row menu, sets a new password and signs that user out everywhere at once.
Deactivate signs the user out everywhere and stops them signing in. Reactivate lets them back in with their current password, so reset it too if the account may have been compromised.
Users are never deleted: an account stays, so its history keeps its name. The built-in administrator can't be changed here.
Screen: /admin/tokens
API tokens let a script or tool use the CPG API as you. Open API tokens from your account card at the bottom of the sidebar, choose Create token, give it a name and create it.
The secret is shown once. Copy it straight away: CPG stores only a fingerprint of it and can never show it again. If you lose it, revoke the token and create a new one.
Send the secret in every API request as the Authorization: Bearer header. The token can do exactly what your account can, in Test and Prod, and it never expires.
Revoke ends a token at once. A password reset or a deactivation ends all of an account's tokens. Tokens can be listed and revoked through the API too, but only created here.
Every API request that changes something needs an Idempotency-Key header: a fresh value, such as a UUID, for each change. If the answer is lost, send the same request with the same key again within 24 hours: CPG returns the first answer and changes nothing twice. A key reused for a different request is refused.
To change a record (a user, a material or one of its unit conversions, a location, a customer or a supplier), send the version you read with it, from GET /api/users or the tenant's GET routes. If someone changed the record since, CPG refuses with a version conflict and keeps their change: read it again and retry. For writes to the Test tenant, also send the Dataset-Generation header with the generation from GET /api/tenants/test.
Screen: /agents
An AI agent such as Claude Code or Codex can work in CPG for you through CPG's MCP server, a small program that runs on your computer and calls CPG's API with your API token. The agent can do exactly what your account can, in Test and Prod, and its changes are audited under your account and the token's name. Revoke the token to cut it off.
The onboarding skill teaches the agent how a planner works in CPG: the daily planning loop, the rules (a posting is corrected by reversing it, never by editing it) and when to ask you first, before any change in Prod. An agent without skills gets the same text from the MCP server as the prompt cpg_onboarding.
The homepage offers both downloads. How to install, linked beside them, opens the installation guide: its commands for Windows, macOS or Linux install uv, add the server to Claude Code, Codex or any other MCP client, and install the skill. The commands already point at the CPG that showed them; replace <token> with your token's secret.
Screen: /admin/[tenant]
CPG keeps two separate sets of business data: Test, with demonstration data that is safe to experiment with, and Prod, the live data.
The row at the top of every page says which one you are working in: TEST in amber, PROD in dark with a red edge, or GLOBAL on pages shared by both, followed by where you are, such as Master data › Materials.
Switch with TEST | PROD at the top of the sidebar: you stay on the same screen in the other tenant, or land on its list when you were on one record. On a page shared by both, the switch only changes which tenant the sidebar's screens open. Nothing you do in one ever appears in the other, and the same number can mean a different record in each.
When the administrator makes a tenant read-only, the switch shows a lock on its side and a banner under the row at the top of its pages says so. Nobody can change its business data then, the administrator and the API included, so the buttons that would change it are gone. You can still read everything, including the audit, and change your own language, theme and API tokens.
Test's generated datasets plan one plant once a week. Thursday's planning run creates next week's production orders and one purchase order per supplier; steel arrives on Monday and the other supplies on Tuesday; intermediates are made on Monday and Tuesday and finished products on Wednesday and Thursday, for the following week's shipments. So a reset leaves a partly received purchase order from Friday to Tuesday, and none on Wednesday or Thursday. This page draws the cycle and the week, and explains why the datasets plan weekly. It opens from How the datasets plan their week, beside Reset Test on the Tenants page.
Screen: /admin/audit
Global audit, at the bottom of the sidebar, opens every change to accounts and to the tenants' settings, newest first. It lists users created, passwords reset, accounts deactivated or reactivated, language or theme changes, API tokens created or revoked, and a tenant made read-only or writable again. A token ended by a password reset or a deactivation is listed as revoked too.
Each entry shows when it happened (in UTC), the account that made it, the session it came from, the channel (UI for CPG's screens, API for programs) and what changed, as before → after.
A password reset is listed without the password: CPG never records passwords or their hashes. When the administrator's password is changed in the server's settings, the administrator's API tokens end at the next restart without an entry here.
Every account can read the audit, and nobody can change or delete an entry, not even the administrator. Older entries shows the previous page.
To trace one account or record, filter by record type and ID, account, channel and a range of days (UTC, both included), then Apply. Clear filters shows everything again. Each entry's subject opens that record's history. A filtered view is a link you can bookmark, and the API takes the same filters: GET /api/audit?subjectType=User&account=alice.
Screen: /admin/[tenant]/audit
Audit, in the sidebar under the tenant's screens (or Audit — Test or Audit — Prod on the tenant's page), opens that tenant's own audit: the changes to its business records, kept apart from the other tenant's.
It lists every material, location, customer and supplier created, changed, deactivated or reactivated, every unit conversion, planning parameter set, safety-stock target and forecast added, changed or removed, and every BOM created, revised, deactivated or reactivated, with the values before and after. It also lists every document and stock posting: purchase requisitions and orders, goods receipts, customer orders, shipments and goods issues, transfers, production orders and completions, stock corrections and reversals. Account changes are always in the Global audit.
To trace one record, open its subject, or filter by record type and ID, account, channel and a range of days (UTC, both included). A filtered view is a link you can bookmark, and the API takes the same filters: GET /api/tenants/test/audit?subjectType=PurchaseOrder&subjectId=00000012.
A stock posting shows its business date under the audit time: the day it counts in stock, which can differ from when it was recorded. A reversed movement says Reversed by, and the movement that reverses it says Reverses; each links to the other's history, and Changes shows the reason.
Like the Global audit, it is read-only for everyone.
Screen: /admin/[tenant]/materials
Materials, under Master data in the sidebar, lists that tenant's materials by ID. Test and Prod each have their own: material 00000001 in Test and 00000001 in Prod are different records.
Every material has an eight-digit ID that CPG assigns in order when it is created (00000001, 00000002, …) and that never changes, a type, a description and a base unit.
The type is raw (bought), intermediate (made and used to make other materials) or finished (made and sold). The base unit is the unit every quantity of the material is stored in, exactly to six decimals. A material can't become raw while a location makes it (planning parameters set to Make).
The base unit is chosen from CPG's list of units, grouped by kind: count, packaging, mass, volume, length, area and time. A unit a material was given before the list existed stays valid for it, and its edit form keeps offering it.
Choose a column header to sort the whole list by it, and choose it again to reverse the order; the arrow shows which column the list is sorted by. Search materials finds those whose ID or description contains every word you type, in any order; capital letters don't matter, Polish ones included, so “łożysko” finds “Łożysko”, but accents do: “lozysko” doesn't find it. Clear search shows the whole list again, sorted as before. Lists of other records sort and search the same way.
Every account can read materials. Only the administrator creates and changes them, with Create material here and Edit on a material's page; through the API too, with the same rules.
Screen: /admin/[tenant]/materials/[id]
Choose a material's ID to open its page: its type, base unit and status, and its unit conversions.
A conversion lets people enter quantities in another unit, such as a case of 12, chosen from the same list of units as the base unit: the base unit and the units the material already converts are shown but can't be chosen. It reads 1 case = 12 each: the alternate quantity and unit, then the base quantity and the base unit. A quantity entered in that unit is converted into the base unit once, rounded half-up to six decimals, and the unit and factor it was entered with are kept. The inverse is shown for orientation only.
Changing or removing a conversion never changes quantities already stored. The base unit can change only while the material has no conversions, planning parameters, safety-stock targets or forecasts, since their values are in it. Once any BOM uses the material, as its output or as a component, neither its type nor its base unit can change again.
Deactivate keeps the material and its history, but it can't be picked for new entries; Reactivate undoes that. Every change appears in the tenant's audit.
Screen: /admin/[tenant]/locations
Locations, under Master data in the sidebar, lists the sites where that tenant's materials are made and stocked. Test and Prod each have their own: location 00000001 in Test and 00000001 in Prod are different records.
Every location has an eight-digit ID that CPG assigns in order when it is created (00000001, 00000002, …) and that never changes, a name and a status. Names don't have to be unique.
Every account can read the list. Only the administrator creates, renames, deactivates and reactivates locations, with Create location and each row's ⋯ menu; through the API too, with the same rules.
Deactivate keeps the location and everything that already uses it, but it can't be picked for new entries; Reactivate undoes that. Every change appears in the tenant's audit.
Screen: /admin/[tenant]/customers
Customers, under Master data in the sidebar, lists who that tenant sells to. Test and Prod each have their own: customer 00000001 in Test and 00000001 in Prod are different records.
Every customer has an eight-digit ID that CPG assigns in order when it is created (00000001, 00000002, …) and that never changes, a name and a status. Names don't have to be unique.
Every account can read the list. Only the administrator creates, renames, deactivates and reactivates customers, with Create customer and each row's ⋯ menu; through the API too, with the same rules.
Deactivate keeps the customer and everything that already uses it, but it can't be picked for new entries; Reactivate undoes that. Every change appears in the tenant's audit.
Screen: /admin/[tenant]/suppliers
Suppliers, under Master data in the sidebar, lists who that tenant buys from. Test and Prod each have their own: supplier 00000001 in Test and 00000001 in Prod are different records.
Every supplier has an eight-digit ID that CPG assigns in order when it is created (00000001, 00000002, …) and that never changes, a name and a status. Names don't have to be unique.
Every account can read the list. Only the administrator creates, renames, deactivates and reactivates suppliers, with Create supplier and each row's ⋯ menu; through the API too, with the same rules.
Deactivate keeps the supplier and everything that already uses it, but it can't be picked for new entries; Reactivate undoes that. Every change appears in the tenant's audit.
Screen: /admin/[tenant]/planning-parameters
Planning parameters, under Master data in the sidebar, tell MRP how each material is supplied at each location: Make (production) or Buy (purchasing), the lead time in whole calendar days, and the minimum lot and lot multiple a proposal must respect, in the material's base unit.
A raw material is always bought. An intermediate or finished material can be made at one location and bought at another. Without a set, MRP will report the material's parameters at that location as missing.
Every account can read the list. Only the administrator adds, changes and removes sets, with Add parameters and each row's ⋯ menu; through the API too, with the same rules. Only active materials and locations can get a new set; existing sets stay when either is deactivated.
Every change appears in the tenant's audit. A material's base unit can't change while it has planning parameters.
Screen: /admin/[tenant]/safety-stock
Safety stock, under Master data in the sidebar, lists the minimum stock to keep of a material at a location. Each target applies from its date until the next target for the same material and location; with no target in force, the target is 0.
Two targets can't share a date. To change a target's quantity, use Change target; to move it, remove it and add one on the new date. A target of 0 ends a buffer from its date.
The status says which target is in effect today (UTC), which ones are scheduled for later, and which earlier ones a later target has replaced.
Every account can read the list. Only the administrator adds, changes and removes targets, with Add target and each row's ⋯ menu; through the API too. Every change appears in the tenant's audit.
Screen: /admin/[tenant]/forecasts
Forecasts, under Sales in the sidebar, list the demand you expect per material, location and day. A forecast names no customer. The MRP run nets customer orders against it, so a forecast is the demand beyond the firm orders.
Enter the quantity in the material's base unit, or in any unit the material converts, such as 2 cases; CPG stores it in the base unit. A material, location and day can have only one forecast. To change the quantity, use Change forecast; to move the day, remove the forecast and add one on the new day.
Above the list, type a material's or a location's ID or name, choose it from the suggestions and select Filter to see their quantities day by day; a field left empty doesn't narrow the list. Clear filter shows everything again. The list is ordered by material, location and day, 100 per page; Previous and Next under it keep the filter.
Every account can read the list. Only the administrator adds, changes and removes forecasts, with Add forecast and each row's ⋯ menu; through the API too. Only active materials and locations can get a new forecast. Every change appears in the tenant's audit, and a removal keeps the quantity it held.
Screen: /admin/[tenant]/boms
BOMs (bills of materials), under Master data in the sidebar, show how that tenant's materials are made. A BOM makes one intermediate or finished material, its output, from raw and intermediate components; the quantities are for one base unit of the output. Each BOM has an eight-digit ID that CPG assigns in order and that never changes.
One output can have several BOMs, its alternatives. Each has a priority (1 is the highest) and a validity: from a date, through a date or with no end, both days included. Two active alternatives for the same output can't have the same priority on any shared day.
A component can be entered in any unit the material converts, such as 2 cases; CPG stores it in the material's base unit (24 each) and keeps what was entered. A BOM can't use its own output, directly or through other BOMs: CPG shows the cycle it would make.
Every account can read BOMs. Only the administrator creates and changes them, with Create BOM here and Edit BOM on a BOM's page; through the API too, with the same rules. Only active materials can be picked.
Screen: /admin/[tenant]/boms/[id]
Choose a BOM's ID to open its page: its output, status, priority and validity, the components of its current revision, and every revision.
A BOM never changes in place. Saving a real change to the priority, the dates or the components creates a new revision; the old ones stay readable from Revisions, unchanged, for the orders that will use them. Saving the same BOM, or entering the same quantity in another unit, creates nothing.
Changing a unit conversion later doesn't change a saved BOM: the line keeps its quantity and the factor it was entered with. To use a new factor, enter the line again.
Deactivate keeps the BOM and its revisions, but it can't be chosen for new orders; Reactivate undoes that after checking its priority again. Neither creates a revision. Every change appears in the tenant's audit.
Screen: /admin/[tenant]/statistical-units
Different products can't be added up: 40 letterboxes and 12 workshop cabinets are not 52 of anything. A statistical unit (SU) solves that for reports. Each product gets one factor saying how many SU one of its base units counts as, such as 1 each = 1.5 SU, and a report filtered by two or more products, or by all of them, shows only SU totals. A report for one product can show any of its units.
There is one SU for the whole application, the same in Test and Prod; only the factors belong to a tenant. A product's factor is one of its unit conversions: on the product's page, choose Add conversion, pick SU and enter Alternate quantity 1.5 and Base quantity 1 for 1 each = 1.5 SU. Changing or removing it works like any other conversion and appears in the audit. Reports use today's factor for all of history.
SU is for reports only. No quantity is ever entered in SU: line forms don't offer it, and an entry in SU is refused as a unit the material doesn't convert. SU can't be a product's base unit either. While a product has an SU factor, its base unit can't change; remove the factor first.
Statistical units, under Master data in the sidebar, lists every finished product with its factor, or Not set, and its other units in SU, such as 1 pallet = 15 SU. A report leaves a product without a factor out of its SU totals and names it. Every account can read this page; Change opens the product's page, where the administrator sets the factor.
Screen: /admin/[tenant]/purchase-requisitions
Cancel ends an Open document before any processing. Close Early abandons the remainder after processing, without reversing stock or recorded work. The confirmation lists abandoned quantities; terminal documents cannot be reopened manually. Both roles may act, except in a read-only tenant.
Purchase requisitions, under Transactions in the sidebar, list what the tenant needs to buy: one material at one location, a quantity and the date it is needed. CPG gives each an eight-digit ID, in order. A new requisition is Open with nothing converted.
A purchase order converts a requisition, wholly or in parts, possibly to different suppliers. Converted shows how much orders have taken so far and Outstanding what is left; when everything is converted the requisition becomes Completed.
A requisition is planned supply only: it never changes stock. The quantity can be entered in any unit the material converts; CPG stores it in the base unit and keeps what was entered.
Every account can create and read requisitions, with Create requisition here and through the API; only active materials and locations can be picked. A read-only tenant refuses new ones. A location with an Open requisition can't be deactivated. Every change appears in the tenant's audit.
Change date on an Open requisition sets a new required date, here or through the API with PATCH, at the version you loaded; the material, location and quantity never change. A read-only tenant refuses it. Every change appears in the tenant's audit.
Screen: /admin/[tenant]/purchase-orders
Purchase orders, under Transactions in the sidebar, list the tenant's orders to suppliers. An order has one supplier, one location and 1 to 100 lines, each with its own planned date. Each order gets an eight-digit ID; a new order is Open.
Create an order directly, or give a line an open requisition of the same material and location: the line then converts that much of the requisition, up to what is outstanding, and the requisition is Completed once fully converted.
A line can't be for another location than the order's. Only active suppliers, locations and materials can be picked; an order made earlier stays usable if its supplier is deactivated later.
An order is planned supply: only the goods receipts posted on its page raise stock. It is Completed once every line has received its quantity. Every account can create and read orders, here and through the API; a read-only tenant refuses new ones. A material with an open order line can't be deactivated, nor a location an Open order delivers to.
Screen: /admin/[tenant]/purchase-orders/[id]
Cancel ends an Open document before any processing. Close Early abandons the remainder after processing, without reversing stock or recorded work. The confirmation lists abandoned quantities; terminal documents cannot be reopened manually. Both roles may act, except in a read-only tenant. Headers stay Open while any line is Open; all Completed means Completed, all Cancelled means Cancelled, and a mixture means Closed Early. Use a line’s action to resolve that line alone, or the header action for all Open remainders.
Reverse a full receipt line from its history or Stock. Give a reason; the inverse posts today and the original stays linked and unchanged. To correct an amount, reverse it then post the corrected amount. Partial reversals are unavailable. A stock shortage refuses the whole reversal. If a temporary positive correction is needed, enter it manually and reverse that temporary correction after the corrected receipt; never leave that extra stock in the balance. A reversed receipt lowers its line's received quantity, and a Completed order that is short again becomes Open.
Choose an order's ID to open its page: its supplier, location, status and every line, with the quantity in the material's base unit, the unit it was entered in, the planned date and the requisition it converted, if any.
Each line shows what has been received and what is still outstanding. Post goods receipt records what arrived: a quantity per line, in any unit the material converts, leaving the other lines empty. Stock rises at the order's location with today's date, and the lines and the order update in the same step, or nothing is posted.
A receipt may be partial, repeated or larger than what is outstanding: an excess is accepted and named in a warning. Once every line has received its quantity the order is Completed and takes no more receipts. Receipts can't be changed; they are listed under Goods receipts, newest first.
Change date on an Open line sets its planned date, also after receipts, while the order is Open. The API changes planned dates with PATCH, several lines at once if needed. Both work at the version you loaded, and each change appears in the tenant's audit. The supplier, the location and a line's material, unit and quantity never change.
Screen: /admin/[tenant]/production-orders
Create one Make output at one location. Preview active date-valid BOMs, pick an alternative and review current component shortages. Shortages allow planning; creating or editing an order moves no stock. The exact BOM revision, unit conversion and calendar-day lead time are kept. Edit target and finish on the detail screen; read-only datasets allow reading only.
An order created by accepting an MRP proposal, or by an automatic MRP run, shows the run's ID under its own ID and as its MRP run field. It is pinned to the BOM revision MRP chose and otherwise behaves like an order you entered.
Screen: /admin/[tenant]/production-orders/[id]
Cancel ends an Open document before any processing. Close Early abandons the remainder after processing, without reversing stock or recorded work. The confirmation lists abandoned quantities; terminal documents cannot be reopened manually. Both roles may act, except in a read-only tenant. A zero-output completion recording waste counts as processing.
The detail screen shows the pinned BOM revision, the stored unit conversion, the captured calendar-day lead time, and the components still needed for the outstanding quantity (the target less what was produced or abandoned) with current shortages: an Open order of 100 with 40 produced needs components for 60. A Cancelled, Completed or Closed Early order needs no components and shows no shortage. On an Open order, edit the target or the planned finish: the start is recalculated from the captured lead time and the BOM stays pinned. Planning moves no stock; read-only datasets allow reading only.
Posting a completion: choose Post completion, enter the output (0 records waste) and Continue. Each BOM component starts at what the pinned BOM expects for that output, for example 0.5 kg per bar × 4 bars = 2 kg; change it to what was actually used, and add any extra raw or intermediate input. Posting adds the output and consumes every material used at the order's location in one posting dated today, and records each material's expected, actual and variance. If any material is short, nothing posts. Going past the target needs “Post more than planned”; reaching the target completes the order. Once production is posted, the target can't go below what was produced.
Reversing a completion: choose Reverse on a completion in the history and give a reason. The whole completion is reversed once, today: the output leaves stock and every material used comes back, at the order's location, in one posting. If the output is no longer in stock, nothing is reversed. The order's produced quantity drops by the output; a Completed order below its target becomes Open again, and a Closed Early order stays closed. There is no partial reversal: to correct a quantity, reverse the completion and post the right one. The API offers POST …/completions/{completionId}/reverse with { reason }.
Screen: /admin/[tenant]/transfers
Transfers, under Transactions in the sidebar, move one material from one location to another. A transfer has a planned quantity, in any unit the material converts, and a planned dispatch and arrival date: the arrival can't be before the dispatch, and the two locations must differ. Each transfer gets an eight-digit ID; a new one is Open.
Creating a transfer changes no stock. Its page dispatches it (stock leaves the source into transit), receives it (stock leaves transit onto the destination) and writes off what was lost on the way. A transfer moves one material: create one transfer per material.
Every account can create and read transfers, here and through the API; only active materials and locations can be picked, and a read-only tenant refuses new ones. A location with an Open transfer from or to it, and a material with an Open transfer, can't be deactivated. The API lists GET /api/tenants/{tenant}/transfers?page=1 and creates with POST to the same path.
Screen: /admin/[tenant]/transfers/[id]
Cancel ends an Open document before any processing. Close Early abandons the remainder after processing, without reversing stock or recorded work. The confirmation lists abandoned quantities; terminal documents cannot be reopened manually. Both roles may act, except in a read-only tenant. Clear all in-transit stock by receipt or write-off first; written-off quantity remains loss, and closing includes it in abandonment.
A transfer's page shows its route, its planned dates and quantities: planned, dispatched, still to dispatch, in transit, received and written off. Stock in transit belongs to the transfer: neither location can use it, and the Stock page shows it apart from the physical balance.
Dispatch takes stock off the source into transit, up to what is left to dispatch and never more than the source holds. Receive lands part or all of what is in transit at the destination, never more. Write off takes a quantity lost on the way out of transit, with a reason; no location changes, and a stock correction can't touch transit. Each posting is dated today and writes both of its sides in one step, or nothing.
Once the whole planned quantity is received the transfer is Completed and takes no more postings. A transfer with a write-off stays Open until it is closed early. Postings can't be changed; the ledger lists each with what it moved, newest first.
Reversing a posting: choose Reverse beside a dispatch, receipt or write-off in the ledger and give a reason. The whole posting is reversed once, today, and both stay in the ledger, linked. A reversed receipt takes its quantity off the destination back into transit, and the destination must still hold it. A reversed write-off puts the loss back into transit. A dispatch can be reversed only after every receipt and write-off of the transfer is reversed; it then returns the stock to the source. Afterwards the transfer is Open again, even if it was Completed or Closed Early, with nothing abandoned. Its material and locations must be active. There is no partial reversal. The API offers POST …/postings/{postingId}/reverse with { reason }.
Change dates edits the planned dates while the transfer is Open, at the version you loaded. The API offers PATCH /api/tenants/{tenant}/transfers/{id} for dates, and POST …/dispatches, …/receipts and …/write-offs for postings, each with a bearer token, an idempotency key and, in Test, the dataset generation.
Screen: /admin/[tenant]/customer-orders
Both roles can create and edit customer orders under Transactions. Choose one active customer and one location for the header; each line has its own material, positive quantity, unit and required date. Orders start Open with zero fulfilled. Entering an order moves no stock. Stored quantities use the material’s base unit; the entered amount and factor stay in history. A customer may be deactivated while existing orders continue. A stale version refuses an overwrite; reload before retrying. A read-only tenant hides write controls and refuses writes.
Screen: /admin/[tenant]/customer-orders/[id]
Cancel ends an Open document before any processing. Close Early abandons the remainder after processing, without reversing stock or recorded work. The confirmation lists abandoned quantities; terminal documents cannot be reopened manually. Both roles may act, except in a read-only tenant. Headers stay Open while any line is Open; all Completed means Completed, all Cancelled means Cancelled, and a mixture means Closed Early. Use a line’s action to resolve that line alone, or the header action for all Open remainders.
Both roles can create and edit customer orders under Transactions. Choose one active customer and one location for the header; each line has its own material, positive quantity, unit and required date. Orders start Open with zero fulfilled. Entering an order moves no stock. Stored quantities use the material’s base unit; the entered amount and factor stay in history. A customer may be deactivated while existing orders continue. A stale version refuses an overwrite; reload before retrying. A read-only tenant hides write controls and refuses writes.
The order's page shows each line's outstanding quantity and the order's shipments, and Create shipment plans a dispatch: see Shipments and goods issues. Goods issues fulfil the lines; a line delivered in full is Completed, and so is the order once every line is. Lowering a delivered line to exactly what was delivered completes it too.
Screen: /admin/[tenant]/shipments/[id]
Reverse a full receipt, issue or correction line from its history or Stock. Give a reason; the inverse posts today and the original stays linked and unchanged. To correct an amount, reverse it then post the corrected amount. Partial reversals are unavailable. A stock shortage refuses the whole reversal. If a temporary positive correction is needed, enter it manually and reverse that temporary correction after the corrected receipt; never leave that extra stock in the balance. Reversed issues restore order progress but keep posted customer, location and line identity locked.
A shipment plans what leaves against one customer order. On the order's page, Create shipment asks for the planned date and a quantity per line, in any unit the material converts, leaving the other lines empty. A line can't plan more than it still has outstanding. Creating a shipment moves no stock and fulfils nothing.
Choose a shipment's ID to open its page: its order, customer, location, planned date and status, and per line what is planned, what has been issued and what is still to issue.
Post goods issue records what actually left: a quantity per line. Stock falls at the order's location with today's date, and the order's lines are fulfilled, in the same step, or nothing is posted. A line can't issue more than it has to issue (the smaller of what the shipment still plans and what the order line still has outstanding), or more than is in stock: the refusal says how much is available.
The issue that delivers a line in full completes it, and the order is Completed once every line is. A shipment is Completed once nothing is left to issue on it. Goods issues can't be changed; they are listed under Goods issues, newest first. Once a line has been issued, its material, unit and required date, the order's customer and location, and a quantity below what was delivered can't be changed.
Edit shipment changes an Open shipment's planned date and lines: raise a line as long as what is left to issue on it stays within what its order line still has outstanding, lower it down to what it has issued, empty a line nothing was ever issued against to remove it, or fill an order line's empty row to add it. Removed line numbers are never reused. Lowering every line to what it issued completes the shipment. Cancel shipment ends an Open shipment nothing was ever issued against, even an issue reversed since: it plans nothing more, and stock and the order are not changed. A Completed or Cancelled shipment can't be edited or cancelled. A stale version refuses the change; reload and try again. A read-only tenant hides both.
Screen: /admin/[tenant]/import
Import, under Master data in the sidebar, loads or updates the tenant's master data and BOMs from one .xlsx workbook. Only the administrator sees it, and it is blocked while the tenant is read-only. Run it when nobody else is changing data: while it runs, other changes wait.
Download the template: it has a sheet for materials, unit conversions, locations, customers, suppliers, planning parameters and safety stock, and two for BOMs, plus instructions in English and Polish. Fill only the sheets you need and keep each sheet's header row. A blank ID creates a record, an existing ID updates it, and an ID that doesn't exist is an error. Nothing is ever deleted by an import.
Sheets are applied in the template's order, so a planning row can use a material the Materials sheet creates: the dry run shows the ID it will get. A BOM's lines are all its components: a component left out is removed in a new revision, identical lines create no revision, and a new BOM's lines name its header by an import reference you choose.
Upload the workbook and run the dry run: it checks every row with the same rules as the screens, writes nothing, and lists every problem by sheet, row and column, or shows what would be created, changed or left unchanged. Only a dry run without problems can be committed, and the commit writes everything in one go or nothing. If anything the workbook uses changed since the dry run, the commit is refused: run the dry run again. At most 2000 rows and 512 KB per workbook. The API offers the same: GET /api/import/template, and POST /api/tenants/{tenant}/import/dry-run and /commit with the workbook as base64.
Screen: /admin/[tenant]/stock
Reverse a full receipt, issue or correction line from its history or Stock. Give a reason; the inverse posts today and the original stays linked and unchanged. To correct an amount, reverse it then post the corrected amount. Partial reversals are unavailable. A stock shortage refuses the whole reversal. If a temporary positive correction is needed, enter it manually and reverse that temporary correction after the corrected receipt; never leave that extra stock in the balance. Reversed issues restore order progress but keep posted customer, location and line identity locked.
Stock in the tenant menu shows the exact physical balance and recent movements for a selected material and location. A pair without movements has zero stock. Test and Prod are separate; a fresh Test holds two months of generated demonstration history, and two years after the admin resets it to the realistic dataset: receipts, production completions and goods issues, each linked to its document.
Either role can post a reasoned correction while the tenant and masters are writable and active. Enter a signed change: 5 adds five and -5 removes five. Pick the base unit or a defined conversion; it converts once, half-up to six decimals, and keeps the entered quantity, unit and factor. The server uses today's UTC business date; backdating and future dating are unavailable. A correction that would make stock negative is refused with the available quantity.
Opening balances and physical customer returns are ordinary positive corrections with a reason; there is no return document. Every user correction creates an immutable stock movement and a separate before/after audit entry. Each movement shows its type and its source document: a goods receipt links to its purchase order, a goods issue to its shipment, a transfer dispatch or receipt to its transfer, a production completion to its production order; a correction (also from a stock import) is its own source. The actor, the posting ID and the unit/factor appear in movement details. Installation openings are explicitly labelled Installation. The ledger shows 100 movements per page, newest first, while the balance includes all movements.
To set many positions at once, such as an opening balance or a stock count, use Stock import (Import from spreadsheet on this screen): you write the quantity each position should have, not the change.
A material with any movement keeps its type and base unit forever, even after returning to zero. Nonzero stock prevents material or location deactivation. The API reads GET /api/tenants/{tenant}/stock?material=00000001&location=00000001&page=1 and posts POST /api/tenants/{tenant}/stock/corrections with a bearer token, idempotency key, current Test generation and material, location, signed quantity, unit and reason.
Screen: /admin/[tenant]/stock-import
Stock import, next to Stock in the sidebar, sets physical stock from one .xlsx workbook: an opening balance, or the result of a stock count. Both roles can use it while the tenant is writable. Download the template: one Stock sheet with Material ID, Location ID, Physical quantity and Unit, and instructions in English and Polish.
Write the quantity each position should have, not the change. The import computes each movement from the current physical balance: 85 where 100 is held posts -15, 130 posts +30, the same quantity is No change and posts nothing, and 0 empties the position. Positions you leave out are untouched, at every location. A quantity in another unit (2 case) is converted with the material's current conversion, so 2 cases of 12 mean 24 each in stock, not 24 more. In-transit stock belongs to its transfer and is never a location's balance: write it off on the transfer.
The dry run reads the balances, writes nothing, and lists each position's movement, or every problem by row and column: a negative quantity, an unknown or inactive material or location, a unit without a conversion (or SU, which is never entered), or the same position twice. Only a dry run without problems can be committed, with one reason for every movement, such as Opening balance or Stock count 2027-01. The commit posts all the movements as one ordinary correction, audited with your account, or nothing. If any listed balance changed since the dry run, the commit is refused: run the dry run again.
At most 2000 rows and 512 KB per workbook. The API offers the same: GET /api/stock-import/template, and POST /api/tenants/{tenant}/stock-import/dry-run with the workbook as base64, then /commit with the workbook, the dry run's previewToken and a reason.
Screen: /admin/[tenant]/reports/stock
Stock report in the tenant menu lists, for every material and location, the physical stock on hand now and the stock in transit: out (dispatched from this location and not yet received or written off) and in (dispatched to this location). All are in the material's base unit. Stock in transit belongs to its transfer, so neither location can use it: it is never added to on hand.
A material and location appear once anything was posted there or an Open transfer has stock on the road from or to it. Filter by material and location; rows that are all zero are hidden unless you tick Show rows that are all zero. Rows are ordered by material, then location, 100 per page.
Ledger opens the Stock page for that material and location: its balance, its transit with links to the transfers, and every movement with its date, type, signed quantity, reason and source document, linked. Both roles can read the report, also in a read-only tenant, and Test and Prod each show only their own stock.
The API returns the same report: GET /api/tenants/{tenant}/reports/stock?material=00000001&location=00000001&includeZero=true&page=1 (every parameter optional), with a bearer token or a signed-in session. A material or location the tenant doesn't have is not found.
Screen: /admin/[tenant]/reports/variance
Variance report in the tenant menu compares what production recorded with what each production order planned. Each order with completions is one row: its target against what its completions produced (the output variance, produced − target), and for every component the expected quantity, the actual quantity, the variance (actual − expected) and the waste, all in the material's base unit. Expected is what the order's pinned BOM revision asks for the output actually produced, as stored when each completion was posted; it is never recalculated from a later revision.
An input that isn't in the pinned BOM is marked Extra: it expected nothing, so its whole actual is variance. A completion with zero output is a waste posting: it produces nothing, is counted under Waste postings, and what it used shows in each component's Waste as well as in its actual. A reversed completion is counted nowhere and its ID is listed under Reversed. Open the order to see each completion on its own.
Filter by material (the order's output, or a component its completions expected or used), location, state, and a From–To range of posting dates. With a date range only the completions posted in it are counted, so no output variance is shown: the target belongs to the whole order. Orders are listed by ID, 50 per page. The report shows no cost, value or capacity figure.
Both roles can read the report, also in a read-only tenant, and Test and Prod each show only their own orders. The API returns the same report: GET /api/tenants/{tenant}/reports/variance?material=00000001&location=00000001&status=open&from=2026-10-01&to=2026-10-31&page=1 (every parameter optional), with a bearer token or a signed-in session. A material or location the tenant doesn't have is not found; an end date before the start date is refused.
Screen: /admin/[tenant]/reports/demand-review
Demand review under Sales shows, for your finished products, what shipped and what is still to ship on one time axis, per day, week or month. Shipped is what goods issues took out, on their business date, at the customer order's location; a reversed issue counts as nothing shipped. Still to ship is the open customer orders, with any order past its required date counted as due today and marked overdue, plus the forecast not yet ordered.
Forecast not yet ordered follows decision D08: a forecast is consumed by the orders of the same product and location whose required date falls in its calendar month, earliest forecast first. Orders closed early or cancelled release what they never shipped. What is left of this month's forecast is due today, and forecasts of months that have ended no longer count.
The chart stacks shipped, open orders and forecast not yet ordered per bucket, with the Ordered line over the past and today: where it runs above shipped, shipping fell behind demand. The table below has the same figures per product, or per location when one product is chosen. Tinted columns are shipped, white ones still to ship, and today's column has both; open a row to see its open orders, the overdue part and the forecast. Earlier and Later move the window; Apply always returns to today.
Several products can only be added up in statistical units (SU): choose one product to see it in its own units. A product without an SU factor is left out of an SU total and named above the chart; set its factor on Statistical units. Both roles can read the review, also in a read-only tenant. The API returns the same figures: GET /api/tenants/{tenant}/reports/demand-review?bucket=week&material=00000001&location=00000001&unit=SU&offset=0 (every parameter optional, material and location repeatable).
Screen: /admin/[tenant]/mrp
MRP in the tenant menu plans every location of the tenant over the next 90 days, today included. For each material and location it starts from today's physical stock and takes away, day by day, what open customer orders still need and the forecast not yet ordered. A forecast is reduced by the orders of its material and location due in its calendar month: what is left of an earlier forecast this month counts today, and the forecasts of past months expire. It adds what open purchase orders still have to deliver and what open requisitions haven't yet turned into purchase orders; a requisition counts as tentative supply, a purchase order as dependable supply. Open production orders add what they have still to produce on their planned finish day, and take what that needs of their BOM's components on their planned start day. Open transfers take stock from the source on the planned dispatch day and add it at the destination on the planned arrival day; stock already in transit arrives at the destination only. A transfer leaves the source only as far as the source can count on that day without its requisitions, and MRP plans only that part. Anything already overdue, an order line, a delivery or a requisition, counts today, and so does an overdue production order's output or need or a transfer's dispatch or arrival. Each day also carries the safety-stock target in force that day, which the balance is compared with but which takes nothing away. A projected balance can go below zero: that is a shortage to plan for, not a change to stock.
Run MRP asks how documents are created, then starts the run. MRP runs only when someone starts it, never by itself, and a run changes no stock or master record, and never an existing document. The page shows the latest run: its ID, its time (UTC), the account that started it and from where (UI or API), the planned days, how many material–location pairs it planned and how it created documents. Its results stay until the next run replaces them; every run keeps its ID and time, but only the latest keeps its results.
Both roles can run MRP while the tenant is writable. In a read-only tenant the button is hidden and nobody can start a run, the administrator and the API included, while the latest run stays readable. Test and Prod each plan only their own data, and resetting Test clears its runs, so its next run is 00000001 again.
Under the run, the report lists the material–location pairs the run planned, 25 a page, each with its lowest projected balance and the first day it runs short; a pair that runs short is marked. Filter by material and location, or choose Days on a pair: once the filters leave one pair, its 90 days follow, today first, in the material's base unit. Each day shows firm demand (what open customer orders still need that day), forecast demand, dependent demand (components of open production orders and of production-order proposals), transfer out (open transfers leaving this location), safety stock (the level the balance should stay above), tentative supply (open purchase requisitions), dependable supply (purchase orders and production) and transfer in (open transfers arriving here), the projected balance at the end of the day before and after MRP's proposals, and the shortage, how far the balance before proposals is below zero. Last, Short requirements lists each requirement still uncovered after the proposals, once, on the day it falls due, in the order MRP serves them: what open production orders and transfers need first, then customer orders, earliest due date first, then the forecast, then the safety stock. Each line names the requirement and how much of it is short, for example “Customer order 00000012, line 1 · due Oct 7 · 8 kg short of 10 kg”. A component that a proposed production needs is listed as that production, with the requirement it serves at the top: “Proposed production of 00000031 · for customer orders due Oct 7”. The Shortage figure and the list measure different things: a day can show a Shortage that a proposal covers, or one left over from an earlier day's requirement, and no entry; the safety stock can be short while the balance is not. A material with an unreadable record lists none.
Where planning parameters exist for a material and location, the run also proposes supply: a purchase requisition when the material is bought there, a production order when it is made there. A day whose balance, after the proposals of earlier days, falls below zero or below that day's safety-stock target gets one proposal. Its quantity covers the gap, raised to the minimum lot and rounded up to a whole lot multiple: with minimum 10 and multiple 6, a gap of 11 becomes 12. Whatever a proposal brings above the target carries into later days. Each proposal starts its lead time, in calendar days, before the day it is needed, and never before today. One that can't finish in time starts today, finishes today plus the lead time and is late by the days between: its stock counts in the balance after proposals only from that day. One that would finish after the last of the 90 days is beyond the horizon, and no day's balance counts it. The projected balance after proposals shows the result. A proposal creates no document until someone accepts it, and a raw material is never proposed for production; a material and location without planning parameters get no proposal. A production-order proposal also plans what it consumes. It uses the BOM with the highest priority that is valid on its planned finish, whose components are all active and can all be supplied on its planned start: from stock and dependable supply (purchase orders, open production orders and transfers, never requisitions or other proposals), less what existing documents and earlier proposals need from that day to the end of the horizon. The quantity is rounded by the lot rules first. A BOM with an inactive component, or with a component that can't be supplied, is passed over for the next one. Each component needs the proposal's quantity times its quantity per unit, rounded up to six decimals, on the proposal's planned start at the same location. When every valid BOM has an inactive component, the material gets a no usable BOM exception and no production proposal. When no usable BOM can be supplied, the run doesn't propose that production. It makes a provisional plan instead: the production it would need, with its quantities, dates and components, through the highest-priority usable BOM, and a no feasible BOM exception listing each BOM's missing components. When the run can supply every component the plan is short of, the plan's needs count like any other demand, since making them is what lets it run: a component's production is proposed for them once its own components can be supplied. Otherwise the components' own production for that plan is provisional too. Purchase requisitions for what it needs are still proposed. A provisional plan's output is never counted in a balance, so the shortage stays visible. An open production order whose BOM has a component deactivated after it was created is at risk: its remaining output is shown apart and not counted, the run raises an at-risk production exception, and no replacement is proposed for the demand it was to cover until the order is closed or cancelled or the component is reactivated. Materials are planned level by level, every product before its components, so a component's needs from all its products and open production orders are netted together and it gets its own proposal. A material on a cycle of BOMs, which CPG never accepts but stored data could contain, gets a BOM cycle exception naming the cycle and no production proposal.
Once the filters leave one pair, its proposals are listed above its days, and the pairs list counts each pair's proposals. A late or beyond-the-horizon proposal carries its warning under its need date. A purchase-requisition proposal has Accept: after you confirm, it creates an Open purchase requisition for the proposal's quantity, required on its need date, which records the run's ID, shown under its ID in Purchase requisitions. A late proposal's requisition is still required on its need date, the day it was meant to cover, so the next run marks it Late until it is converted into a purchase order, its date moves, or its lead time can meet it; once its date has passed it is marked Overdue instead. Before creating it, CPG plans again from the current stock and documents. If the proposal would now be different, a newer run has replaced this one, or the run is from an earlier day, it is refused as out of date and you run MRP again. A proposal can be accepted once, and accepting never changes an existing document. A production-order proposal's Accept creates an Open production order pinned to the BOM and revision MRP chose, for the proposal's quantity, finishing on its need date and starting the location's lead time before it, which records the run's ID, shown under its ID in Production orders; no stock moves. A changed BOM revision or lead time makes it out of date too. Accept is offered while the tenant is writable. The API: POST /api/tenants/{tenant}/mrp/runs/{run}/proposals/{proposal}/accept with a bearer token, an Idempotency-Key and, in Test, the Dataset-Generation header; each proposal's id comes from GET /api/tenants/{tenant}/mrp/runs/latest.
For example, with 50 in stock and open order lines of 10 due on 5 October and 15 due on 7 October, a run on 1 October shows firm demand 10 and a projected balance of 40 on 5 October, 0 and 40 on 6 October, and 15 and 25 on 7 October. With 5 in stock and 20 due, the balance that day is −15: a shortage to plan for, while the stock itself stays 5.
View switches one pair's table between Day and Week. Week groups the days into calendar weeks, Monday to Sunday, numbered as in the demand review (W41), and only displays them: the stored days don't change. Flows are summed over the week: demand, supply and transfers (the API also sums proposed receipts). The safety stock and both projected balances are the week's last day, and two figures come from its weakest day: the lowest projected balance and the peak shortage. Balances and shortages are never added up. The first and last weeks are cut to the 90 days and marked partial. For example, with a balance of 10 at the end of Sunday 4 October, demand of 8 every day of W41 and receipts of 20 on Wednesday and 30 on Saturday, the days end at 2, −6, 6, −2, −10, 12 and 4. W41 shows demand 56, receipts 50, a projected balance of 4, a lowest balance of −10 and a peak shortage of 10: not 6, the sum of the balances, nor 18, the sum of the shortages.
Warnings mark the day, and the week, a date falls on. Overdue: a purchase-order line, a requisition or a production order's output that was due before the run's first day and is still open; MRP expects it on the first day, and the mark names the document, its own date and the quantity. Overdue Transfer: stock due to arrive from a transfer before the first day; it is expected at the destination on the first day. Late: an open requisition required sooner than its material's purchasing lead time allows from the run's first day; it still counts on its own date, and the mark names the requisition, how many days late it is, the earliest date it could arrive and the quantity. Late Supply: a proposal that can't arrive by its need date with its lead time; it is marked on its need date with how many days late it is and its planned finish. Beyond Horizon: a proposal that would finish after the 90 days; it is listed with its proposals, marked on its need date, and counts on no day. A warning changes nothing: it shows what the run already counted.
Why this BOM, under a production-order proposal, explains a fallback: every BOM the run passed over before the one it chose, in the order it tried them. A BOM is passed over when one of its components is inactive (Inactive BOM Component, naming it) or when a component can't be supplied: each such line says what the proposal needs, what is dependable from stock and dependable supply, and what is short, in that component's base unit, for example "Sugar: needs 6 KG, dependable 5 KG, short 1 KG".
Explanations, at the end of the report, cover the pairs on the page, so the filters narrow them. Provisional plans are listed apart, under a "Provisional — not executable" note: production no BOM can supply, and the production of its components that only that plan needs while one of its components can't be supplied, each with its quantity, dates, BOM, components and blockers. Each component opens its own pair, so you can follow the chain down to the materials to buy, whose requisitions stay among the proposals. A provisional plan is never in a supply column or a balance and can't be accepted.
At-risk production orders are open orders whose pinned BOM has a component deactivated since: each shows its unproduced balance, the inactive components and the label At-Risk Existing Production / Inactive BOM Component, and its output appears in the day's At-risk supply column, apart from dependable supply, while the shortage it was to cover stays visible. Exceptions lists every other planning exception with its type, material, location, date and explanation: Missing Planning Parameters, Missing BOM, Missing Usable BOM, Unit not convertible, BOM cycle, No Feasible BOM (naming each rejected BOM and why) and Insufficient Transfer Stock.
Creation, in the Run MRP dialog: Manual, the default, only lists proposals for you to accept one at a time. Automatic also creates every proposal MRP can create, each tagged with the run, in one batch: if one of them can't be created, none is, and the run's card says which and why while the run's report stays. Production-order proposals are created as production orders, pinned to the BOM MRP chose; provisional plans, exceptions and transfers never are. A second automatic run plans against the first one's documents, so it never creates a need twice. The API takes the same choice: POST /api/tenants/{tenant}/mrp/runs with { "mode": "automatic" } answers the run and the documents it created; a replay with the same Idempotency-Key answers the same run and documents.
Each run plans again from scratch, from the stock and documents of that moment. A requisition accepted from an earlier run counts as supply like any other, keeping that run's ID, so the next run doesn't propose it again; a cancelled one no longer counts. When a pair's open documents (requisitions, purchase orders, production orders and transfers on their way in) bring more than its demand and safety stock need by the horizon's last day, its days and weeks show that excess. MRP never cancels, reduces or moves a document. The API gives each pair's excess as excess, 0.000000 when there is none.
The API: POST /api/tenants/{tenant}/mrp/runs with a bearer token, an Idempotency-Key and, in Test, the Dataset-Generation header runs MRP. GET /api/tenants/{tenant}/mrp/runs/latest?page=1 returns the latest run and the report of 25 material–location pairs per page, the same figures as the page as exact six-decimal texts; add material={id} and location={id} to filter it. Each pair lists its warnings as marks, each with its kind (overdue-supply, overdue-transfer, late-requisition, late-supply or beyond-horizon) and the day it falls on; add bucket=week to get each pair's weeks too, with the same figures and marks as the Week view, while its days stay as they are. Each pair also lists its proposals, with their id, kind (purchase-requisition or production-order), need date and quantity, planned start and finish (plannedStart, plannedFinish), how many days late it is (lateDays), whether it finishes beyond the horizon (beyondHorizon), the BOM and revision a production-order proposal plans through (bom, bomRevision, or null), whether they can be accepted (executable) and the document accepting one created (document, or null), and the BOMs it passed over (rejectedBoms): on a proposal, a provisional plan (provisional) and the NO_FEASIBLE_BOM and MISSING_USABLE_BOM exceptions, each with its bom, revision, reason (shortage or inactive-component) and the shortages of its components as exact texts. Each pair also lists its shortages, the Short requirements of every day, in the same order: each with its kind (component, transfer, customer-order, planned-component, forecast or safety-target), the day it is short (date), its priority date (originalDate), its document and position where it has them (or null), what it requires and how much is uncovered as exact texts (required, uncovered), and for a planned component its root, the kind and date of the requirement it serves. When you read further pages, pass run={id}&generation={n} from the first one: if a newer run has replaced it, the answer is 409 MRP_RUN_SUPERSEDED.
Screen: /admin
Choose English or Polski, and Light or Dark, in your account card at the bottom of the sidebar.
The choice belongs to your account: it stays after you sign out, follows you to other browsers, and never changes anyone else's.
Before you sign in, CPG shows English and the light theme.
Screen: /help
Type one or more words and choose Search. Topics that contain every word are shown.
Capital letters and Polish diacritics don't matter: “logowanie” and “LOGOWANIE” find the same topics, and so do “łatwo” and “latwo”.
Every screen of CPG has at least one topic, and new screens add theirs.